Wind Shields

Wind shield cladding systems are designed to protect personnel and equipment against the effects of radiant heat and adverse arctic conditions with high wind speeds and consequent chill factors.

Windshield cladding systems can achieve an immediate percentage reduction in incident wind velocity in excess of 75%. The energy dissipating design of the system means that half a metre behind the panel the percentage reduction in wind velocity increases to 86%.

Panels are available with various single skin perforation patterns or in a double skin arrangement to suit a project's required performance. The panels corrugated geometry is carefully selected to enhance its spanning capacity without detriment to its performance.

MTE provides a full turnkey package for the ventilated cladding system from survey, design, manufacture, delivery and installation.

Advantages / Benefits of MTE Ventilated Cladding Systems:

  • Designed for a minimum of 40 year lifespan
  • Proven maintenance free stainless steel system
  • Allows natural ventilation
  • Allows natural light and visibility through the panel
  • Light weight and rigidly structured
  • Easy to install & remove individual panels
  • Manufactured to suit customers’ requirements
  • Spans deck to deck and requires no secondary support steelwork
  • Tailor-made to accommodate existing structural steelwork
  • Suitable for intermittent and severe thermal cycling conditions
  • Penetrations can be incorporated within panels at site unlike that of woven mesh systems
  • Full technical support available

Contacts

Also in this section

News

Visit MTE at Topsides 2017

18 January 2017

We will once again be exhibiting at the Topsides, Platforms & Hulls Conference and Exhibition in New Orleans, USA. Held on the 21st to 23rd February, we will be showcasing our offering and demonstrating our capabilities to the offshore energy industries.

read more
Recent Contracts

Mech-Tool Engineering Limited Lands Contract on BP Kinneil Scheme

08 August 2016

Burnt Island Fabrications (BiFab) has awarded the contract for the supply of fire and blast relief walls and specialist fire louvres on the BP Kinneil project to Mech-Tool Engineering Limited.

more details
Connect

Sign Up to our Newsletter

Partners:
fpal achilles sci twi fabig energi coast eic nof Areg member Norway 2 UK

© Copyright Mech Tool Engineering Ltd 2011 - 2017. All Rights Reserved. See our privacy policy.
Mech Tool Engineering Ltd is registered in England and Wales, Company Number 4087377, VAT Number GB 874 8146 86. Disclaimer: Telephone calls may be recorded for training and monitoring purposes. Created by Edward Robertson web design with the Responsive Grid System.

www.mechtoolkorea.comwww.mechtoolkorea.com