Equipment Rooms

Typical uses include: E-Houses (Electrical House), Prefabricated Electrical Buildings (PEB's), Remote Instrument Enclosures (RIE), Control Rooms, Local Equipment Rooms (LER), 33KV Room, 11KV Room, Compression Room, Laboratory Modules, Variable Speed Drive (VSD) Modules and Pump Houses.


E-Houses (Electrical House) prefabricated modular enclosures built to house switchgear and auxiliary equipment.

Prefabricated Electrical Buildings (PEB’s) designed for the protection of switchgear and other electrical equipment.

Local Equipment Rooms (LER's) fire and blast rated LER modules fully equipped with all the required HV & LV equipment, HVAC units, fire and gas systems etc.

Modules are purpose designed to meet the clients’ specified explosion, seismic, thermal, fire and acoustic performance criteria, and can be constructed from carbon steel, duplex or 316L stainless steel, complete with all electrical, HVAC and packaged equipment systems installed, tested and commissioned.  This includes the supply of modular buildings to cover a range of duties and sizes ranging from small road transportable units to large site assembled buildings manufactured in modular units.

MTE Ltd has the capability and facilities to design, build and load-out modules exceeding 1000 tonnes.  These modular buildings can be supplied in one piece directly from our riverside facility for onward sea transportation.

  • Design, engineering, assembly, architectural fit-out, pre-delivery testing, transportation & installation
  • Design loads – in addition to normal transportation & handling loads we can address seismic, explosion, thermal and acoustic requirements
  • Full turnkey supply, installation and project management of mains power distribution, internal & external lighting, DC emergency power, security, F & G detection, alarm systems, CCTV and HVAC systems
  • Modularised option for larger units offering ease of shipping and minimal site work
  • Larger units available in kit-form for site assembly
  • Services include site installation, site supervision, offshore surveys, risk assessment & safety audits
  • All components fully tested and certified
  • Quality Accreditation to ISO 9001:2008

Contacts

  • Steve Oliver

    Business Development Director - Modular Solutions

    Tel +44 (0)1325 355141

    Email steve@mechtool.co.uk

  • Gary Norman

    Sales Manager - High Integrity Modular Solutions

    Tel +44 (0)1325 355141

    Email gary@mechtool.co.uk

News

MTE Attend Seminar Focusing on the Outlook for UK Energy Storage

25 April 2017

MTE's Steve Oliver to attend high profile Energy, Environment and Transport Seminar in Central London, as we step into the capacity market.

read more
Recent Contracts

Mech-Tool Engineering Limited Lands Contract on BP Kinneil Scheme

08 August 2016

Burnt Island Fabrications (BiFab) has awarded the contract for the supply of fire and blast relief walls and specialist fire louvres on the BP Kinneil project to Mech-Tool Engineering Limited.

more details
Connect

Sign Up to our Newsletter

Partners:
fpal achilles sci twi fabig energi coast eic nof Areg member Norway 2 UK

© Copyright Mech Tool Engineering Ltd 2011 - 2017. All Rights Reserved. See our privacy policy.
Mech Tool Engineering Ltd is registered in England and Wales, Company Number 4087377, VAT Number GB 874 8146 86. Disclaimer: Telephone calls may be recorded for training and monitoring purposes. Created by Edward Robertson web design with the Responsive Grid System.

www.mechtoolkorea.comwww.mechtoolkorea.com