Mech-Tool, a recognised specialist in the design and manufacture of modularised buildings, has recently completed the design, manufacture and supply of a multi services processing module for a leading UK nuclear plant.
The 10 no modular construction, which totaled 24.4m long x 3.5m wide and 14m high, housed all of the plant services and utilities. Prior to transport, the entire construction was assembled and tested replicating, access, space and lifting restrictions using the site services team.
Related articles
Pilar Vera-Rodriguez
Job title: Sales & Marketing Coordinator
T +44 (0)1325 355141